Installation of a New Modular MRI Unit at St Helier Hospital
CLIENT – Epsom & St Helier University Hospitals
VALUE – £297K
DURATION – 7 Weeks
Project Information:
Burren and Whitaker Construction are proud to have delivered this much anticipated NHS project as St Helier Hospital opened its first new modular MRI Unit. The unit was installed over a weekend managed by AGITO Medical. The modular building was manufactured by Lamboo Mobile Medical overseas.
Stages of the build and install are shown below:
AGITO MEDICAL
AGITO Medical is THE solution to flexible and cost-efficient imaging equipment solutions for hospitals, clinics and distributors world-wide, providing pre-owned imaging equipment, rental solutions and spare parts.
AGITO Medical has developed a unique rental concept, providing clients with a wide selection of customized medical trailers and modular buildings, available for short and long-term rental.
LAMBOO MOBILE MEDICAL
Lamboo Mobile Medical is a leading company in manufacturing modular relocatable MRI units. These units are manufactured & delivered as ‘turnkey’ solutions. Once delivered it can be operational in a matter of hours. Lamboo Mobile Medical manufacture high quality modular relocatable MRI units.
Lamboo Mobile Medical manufactures its modular relocatable MRI units with a patented sandwich panel technology. The sandwich walls for the modular relocatable MRI can have up to 14 layers of materials integrated in one solid wall.
EXCAVATION WORK
PILING & GROUND BEAMS
INSTALLATION AND COMPLETION
PROJECT DESCRIPTION
The MRI project had a combination of Building & Civil works within a live
environment (activities in adjacent buildings) and consisted of the following:
Ground works including specialist piling
Construction of ramps & steps
Hard landscaping
Siting of relocatable modular units to form the proposed MRI Unit
Electrical & Mechanical (which is the connection of main power
supply from other blocks via the undercroft & termination in identified
site location) installations.
CLIENT FEEDBACK
…
Address
Burstow Lodge Court Burstow Lodge Business Centre, Chapel Road, Horley RH6 9YR
Call Us
01342844118
Email Us
MOST RECENT PROJECTS
![Nursery Garden Refurbishment Project at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/b848aae1-c2a8-4570-8618-0edda983ee78-510x382.jpg)
![CAT B Fit out Ground/1st Floor to Epsom High Street Horizon Building](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/06/e46cd9bd-df7a-4182-b48f-dbf084b2ee13-510x382.jpg)
![Staffroom Refurbishments at Frimley Park Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/204-510x382.jpg)
![Repair Works to Chadwick House at Roehampton University](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/94ad37ee-b8c8-4184-9f12-6dd324b71010-510x382.jpg)
![Emergency Department Remodelling Works at Epsom General Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/02/d980d065-246c-4461-bf43-a1dea9089b1e-510x382.jpg)
![Heatherwood Hospital Office Refurbishment](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/11/5s-510x382.jpg)
![CAT B Fit out 2nd/3rd Floor to Epsom High Street Horizon Building](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/09/09416b69-7316-48a0-88da-571b7d395e29-510x382.jpg)
![Ward Refurbishment to Queen Mary’s Hospital for Children at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/10/20201001_1648031-510x382.jpg)
![Refurbishment of the Children’s Garden](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/09/e219cfc3-a352-447d-8f9f-dff60895b0b6-510x382.jpg)
![New X-Ray Department at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/28c6635e-7719-4c8a-a511-0eba4bf2bd79-510x382.jpg)
![Refurbishment of the Pathology Department at Royal Surrey Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/7ddd4873-6f65-4d3c-be2b-2f068ba4a080-510x382.jpg)
![Refurbishment of the Maternity Department at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/04/5055fa5a-13be-4212-89d6-b9b98772afb2-510x382.jpg)
![Emergency COVID-19 Clinical Decision Centre at Leatherhead Community Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/fc5e13f7-d640-41d5-b6a6-168cb877e345-510x382.jpg)
![New Gamma Camera Department at Royal Surrey Guildford](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/20200124_072909_resized-510x382.jpg)
![Refurbishment of the Uro-Gynae Department at Leatherhead Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/3bc8c4b8-af4f-4e8d-b01a-dbdacc67f421-510x382.jpg)
![Emergency COVID-19 Pod at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/fcb50e07-6c91-464b-8b42-43ae90e7536b-510x382.jpg)
![New Clinical Simulation Centre at Roehampton University](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-13-at-13.01.56-510x382.jpeg)
![Installation of a New Modular MRI Unit at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/f37b26bf-4deb-4e90-b9cc-379ec47d1ccf-510x382.jpg)
![Refurbishment of the Cardiology Investigations and Lung Function Unit at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-13-at-11.43.43-1-510x382.jpeg)
![Jewellery Works UCA Farnham](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/12/IMG_5553-510x382.jpg)
![Ambulatory Care Unit St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/06/WhatsApp-Image-2020-01-14-at-14.15.30-510x382.jpeg)
![A&E X-Ray Main Works at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/04/WhatsApp-Image-2020-01-14-at-13.41.161-510x382.jpeg)
![Headley Wing Entrance at Epsom General Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/04/IMG_4540-510x382.jpg)