Ward Refurbishment to Queen Mary’s Hospital for Children at St Helier Hospital
CLIENT – Epsom & St Helier University Hospitals
VALUE – £519K
DURATION – 10 Weeks
Project Information:
The refurbishment of the second level of Queen Mary’s Hospital involved completely gutting out the entire area and starting from scratch. It was a fast paced project as currently ill children had to be transported to a temporary location whilst the works were being completed. There was also added pressure due to the COVID-19 climate we are in as precious bed space was being taken up. By the end of the job, we had created; Three 4 bed wards, one 3 bed ward, nine 1 bed cubicles; one sluice room, one nurse room, two disabled wet rooms including dock end packed toilets, two WC’s, one en suite toilet, one meeting room, one parents room, a reception area including 3 nurse base stations, one equipment store room, one cleaners cupboard and a treatment room.
PROJECT DESCRIPTION
The new ward refurbishment consisted of the following:
- Demolition
- New partitions
- Installation of new door sets including ironmongery
- Duct work configuration
- New suspended ceiling and also adaption to existing curved ceiling
- Installation of vinyl flooring throughout entire area
- Installation of sun reflective film to windows
- New heat resistant roller blinds to windows
- Three reception desks
- Nurse call systems
- Security mag lock access control fitted to doors (unlock via smart pads)
- Bioclad installation to walls
- 1st and 2nd fix electrical
- 1st and 2nd fix mechanical
- Installation of numerous IPS panels
- Scaffold erection
- Core drilling to allow for a waste connection to the floor below
- Medical gas installation (air,vacuum,oxygen)
- Decoration works
- Shelving installation
- Maccerator installation (machine to wash bed pans)
- Configuration of existing structural openings (taking out sliding doors and installation architraves)
- Cableflow trunking
- Worktop installation to several areas
- Rendering patch work
- MDF boxing to domestic pipework
- Cubicle track installation
Head Office
Burstow Lodge Court, Chapel Road, Smallfield, Horley, Surrey, RH6 9YR
Call Us
01342844118
Office Hours
Mon-Fri: 8am – 5pm
Sat-Sun: Closed
MOST RECENT PROJECTS
![Nursery Garden Refurbishment Project at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/b848aae1-c2a8-4570-8618-0edda983ee78-510x382.jpg)
![CAT B Fit out Ground/1st Floor to Epsom High Street Horizon Building](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/06/e46cd9bd-df7a-4182-b48f-dbf084b2ee13-510x382.jpg)
![Staffroom Refurbishments at Frimley Park Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/204-510x382.jpg)
![Repair Works to Chadwick House at Roehampton University](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/94ad37ee-b8c8-4184-9f12-6dd324b71010-510x382.jpg)
![Emergency Department Remodelling Works at Epsom General Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/02/d980d065-246c-4461-bf43-a1dea9089b1e-510x382.jpg)
![Heatherwood Hospital Office Refurbishment](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/11/5s-510x382.jpg)
![CAT B Fit out 2nd/3rd Floor to Epsom High Street Horizon Building](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/09/09416b69-7316-48a0-88da-571b7d395e29-510x382.jpg)
![Ward Refurbishment to Queen Mary’s Hospital for Children at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/10/20201001_1648031-510x382.jpg)
![Refurbishment of the Children’s Garden](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/09/e219cfc3-a352-447d-8f9f-dff60895b0b6-510x382.jpg)
![New X-Ray Department at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/28c6635e-7719-4c8a-a511-0eba4bf2bd79-510x382.jpg)
![Refurbishment of the Pathology Department at Royal Surrey Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/7ddd4873-6f65-4d3c-be2b-2f068ba4a080-510x382.jpg)
![Refurbishment of the Maternity Department at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/04/5055fa5a-13be-4212-89d6-b9b98772afb2-510x382.jpg)
![Emergency COVID-19 Clinical Decision Centre at Leatherhead Community Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/fc5e13f7-d640-41d5-b6a6-168cb877e345-510x382.jpg)
![New Gamma Camera Department at Royal Surrey Guildford](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/20200124_072909_resized-510x382.jpg)
![Refurbishment of the Uro-Gynae Department at Leatherhead Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/3bc8c4b8-af4f-4e8d-b01a-dbdacc67f421-510x382.jpg)
![Emergency COVID-19 Pod at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/fcb50e07-6c91-464b-8b42-43ae90e7536b-510x382.jpg)
![New Clinical Simulation Centre at Roehampton University](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-13-at-13.01.56-510x382.jpeg)
![Installation of a New Modular MRI Unit at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/f37b26bf-4deb-4e90-b9cc-379ec47d1ccf-510x382.jpg)
![Refurbishment of the Cardiology Investigations and Lung Function Unit at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-13-at-11.43.43-1-510x382.jpeg)
![Jewellery Works UCA Farnham](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/12/IMG_5553-510x382.jpg)
![Ambulatory Care Unit St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/06/WhatsApp-Image-2020-01-14-at-14.15.30-510x382.jpeg)
![A&E X-Ray Main Works at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/04/WhatsApp-Image-2020-01-14-at-13.41.161-510x382.jpeg)
![Headley Wing Entrance at Epsom General Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/04/IMG_4540-510x382.jpg)
![CHAS-Logo-November-2017](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/02/CHAS-Logo-November-2017.jpg)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2017/05/construction-line.jpg)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2017/05/FSB-logo.png)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2017/05/NFB-logo.jpg)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/02/Q-Mark-FDI-no-ukas-logo.png)
![Reset_Member_Company_Logo-1024x760 (2)](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/Reset_Member_Company_Logo-1024x760-2.jpg)