Refurbishment of the Pathology Department (Ground, 1st & 2nd) Floor at Royal Surrey County Hospital
CLIENT – Royal Surrey County Hospital
VALUE – 850K
DURATION –52 Weeks
Project Information:
The completion of Pathology Department involved specialist contractors such as, AFOS Benches, S&B Laboratory Benching Installaion, Medallion Ductwork Specialists, Roche HE600 Installation, without disturbing the 24hour, 7 day working of the Pathology/Histology departments.
PROJECT DESCRIPTION
The refurbishment of the 1st Floor Pathology Department at Royal Surrey County Hospital consisted of the following:
Phase 1 (Enabling Works – Ground & 2nd Floor):
- Installation of Offices ‘Portakabins’ and assosciated ground works
- Installation of Storage Containers
- Electrical connections
- Mechanical connections
- Access Temporary Scaffold Ramps
- Armco Barrier Installation
- Removal of Windows
- Installation of Specialist ductwork to Temporary Lab areas
- Decoration to Temporary Lab areas
- Flooring to Temporary Lab areas
- Relocation/move of AFOS Cut-up Benches
- Relocation of S&B Laboratory Benching to all areas on Ground & 2nd Floors
- Test and Commissioning
- Fixtures and Fittings relocation
Phase 2 (1st Floor Refurbishment):
- Full demolition and strip out
- New partitions
- New extract system – ductwork
- Specialist AFOS bench ductwork
- Heater battiers above ceiling
- MF Ceilings to Main Lab Areas
- Radiant Heating Panels to office areas
- Relocation of existing doorsets
- Install new doorsets
- Replacement of Ironmongery
- Installation of ESD Vinyl flooring to Labs and Polyflor to Offices
- CS Wallflex System Decoration to Lab Areas
- Dulux Deocation to Offices
- Installation of Black out Blinds
- Installation of Roller Blinds
- Signage
- AFOS Benches Install
- S&B Laboratory Benching Install to Lab Areas
- Installation of Shelving
- Installation of Specialist Wire Racking
- Installation of Bespoke Belfast Sink
- Fire Stopping to entire department
- 1st & 2nd Fix Electrical
- Electrical power polls to IHC
- New Mechanical services and domestics
- MDF boxings to ductwork and existing domestic pipework
- Relocation of IPS Systems
- Intallation of all fire damper panels
- New Control panel for BMS
- New Control panel for AFOS Benches extract system
- Scaffolding towers to Roof top
- Rendering patchwork
- Suspended ceiling install
- Core drilling for additional waste to ground floor
- Silione
- Fixtures and Fittings
- Installation of Roche Machines HE600 to Main Lab
- Corner Protectors to All Areas
- Hygenic Wall Cladding to corridors
- Altro Whiterock wall cladding to all wet areas
- Laboratory Coat Hooks
The refurbishment of the Ground & 2nd Floors Pathology Department at Royal Surrey County Hospital consisted of the following:
Phase 3 (Consultants Offices):
- Installation of Offices Partitions
- Removal of Storage Containers
- Electrical connections
- Mechanical connections
- Installation of new Lavis Suite External Ramp
- Installation of Windows Blinds and Blackout blinds
- Installation of new ductwork and fan coil unit
- Decoration to all areas
- Flooring to all areas
- Relocation/move of AFOS Cut-up Benches – Strip out existing lab benching
- Corner Protectors
- Sound insulations to suspended ceiling
- Fire stopping
- Installation of Beverage area
- Signage
- Shelving
- New FD60 and FD30 doorsets
- Test and Commissioning
- Fixtures and Fittings relocation
Head Office
Burstow Lodge Court, Chapel Road, Smallfield, Horley, Surrey, RH6 9YR
Call Us
01342844118
Office Hours
Mon-Fri: 8am – 5pm
Sat-Sun: Closed
MOST RECENT PROJECTS
![Nursery Garden Refurbishment Project at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/b848aae1-c2a8-4570-8618-0edda983ee78-510x382.jpg)
![CAT B Fit out Ground/1st Floor to Epsom High Street Horizon Building](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/06/e46cd9bd-df7a-4182-b48f-dbf084b2ee13-510x382.jpg)
![Staffroom Refurbishments at Frimley Park Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/204-510x382.jpg)
![Repair Works to Chadwick House at Roehampton University](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/04/94ad37ee-b8c8-4184-9f12-6dd324b71010-510x382.jpg)
![Emergency Department Remodelling Works at Epsom General Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2021/02/d980d065-246c-4461-bf43-a1dea9089b1e-510x382.jpg)
![Heatherwood Hospital Office Refurbishment](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/11/5s-510x382.jpg)
![CAT B Fit out 2nd/3rd Floor to Epsom High Street Horizon Building](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/09/09416b69-7316-48a0-88da-571b7d395e29-510x382.jpg)
![Ward Refurbishment to Queen Mary’s Hospital for Children at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/10/20201001_1648031-510x382.jpg)
![Refurbishment of the Children’s Garden](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/09/e219cfc3-a352-447d-8f9f-dff60895b0b6-510x382.jpg)
![New X-Ray Department at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/28c6635e-7719-4c8a-a511-0eba4bf2bd79-510x382.jpg)
![Refurbishment of the Pathology Department at Royal Surrey Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/7ddd4873-6f65-4d3c-be2b-2f068ba4a080-510x382.jpg)
![Refurbishment of the Maternity Department at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/04/5055fa5a-13be-4212-89d6-b9b98772afb2-510x382.jpg)
![Emergency COVID-19 Clinical Decision Centre at Leatherhead Community Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/fc5e13f7-d640-41d5-b6a6-168cb877e345-510x382.jpg)
![New Gamma Camera Department at Royal Surrey Guildford](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/20200124_072909_resized-510x382.jpg)
![Refurbishment of the Uro-Gynae Department at Leatherhead Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/3bc8c4b8-af4f-4e8d-b01a-dbdacc67f421-510x382.jpg)
![Emergency COVID-19 Pod at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/03/fcb50e07-6c91-464b-8b42-43ae90e7536b-510x382.jpg)
![New Clinical Simulation Centre at Roehampton University](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-13-at-13.01.56-510x382.jpeg)
![Installation of a New Modular MRI Unit at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/f37b26bf-4deb-4e90-b9cc-379ec47d1ccf-510x382.jpg)
![Refurbishment of the Cardiology Investigations and Lung Function Unit at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-13-at-11.43.43-1-510x382.jpeg)
![Jewellery Works UCA Farnham](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/12/IMG_5553-510x382.jpg)
![Ambulatory Care Unit St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/06/WhatsApp-Image-2020-01-14-at-14.15.30-510x382.jpeg)
![A&E X-Ray Main Works at St Helier Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/04/WhatsApp-Image-2020-01-14-at-13.41.161-510x382.jpeg)
![Headley Wing Entrance at Epsom General Hospital](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2019/04/IMG_4540-510x382.jpg)
![CHAS-Logo-November-2017](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/02/CHAS-Logo-November-2017.jpg)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2017/05/construction-line.jpg)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2017/05/FSB-logo.png)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2017/05/NFB-logo.jpg)
![](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/02/Q-Mark-FDI-no-ukas-logo.png)
![Reset_Member_Company_Logo-1024x760 (2)](https://www.burrenandwhitaker.co.uk/wp-content/uploads/2020/06/Reset_Member_Company_Logo-1024x760-2.jpg)