Urgent Treatment Centre at Epsom General Hospital

CLIENT – EPSOM AND ST HELIER TRUST

VALUE – £650,000

DURATION – CARRIED OUT IN PHASES – 20 WEEKS

The adaptation and refurbishment of an existing Clinical / Admin area into an Urgent Care Centre.
The Works comprise some demolition and alteration works; new partitions and internal door sets; floor, wall and ceiling finishes; new fittings and sanitary fittings; mechanical, electrical and medical gas installations. Several phases of this work was carried out in a live department with close liaison with staff to ensure the continued and uninterrupted operation of the department.