Work we've completed
You can see below some of our recent projects.
Barrel ceiling at St Helier Hospital for Epsom & St Helier NHS trust
The design idea for the barrel ceiling was to help with the acoustics.
We used specialised British Gypsum Line 7 Curve plasterboard and the
glazed partition walls create a feeling of space whilst maintaining
a contained waiting room area.
Charterhouse School Leisure Centre Facilities
Charterhouse School is one of the UK’s premier public schooling
facilities. At Charterhouse we worked with Ecophon UK to achieve the
correct level of acoustics required for the dance and fitness studio.
It was critical to install suspended ceilings which would help to contain
the noise, and also disperse any echo within the studio. We carried
this theme through to the leisure centre corridors to keep noise levels
to a minimum which was highly effective.
Costa Coffee Odeon Cinemas UK for Martek Contracts
We are currently undertaking the drylining fit out of 6 Costa Coffee
outlets situated within the Odeon Cinemas across the UK from Brighton
to the Trafford Centre, Manchester. Utilizing plasterboard ceilings
and feature upstands, we work towards Odeon Cinema’s vision of
a relaxed environment for all cinema goers. With fresh new colours and
creative designs, the new coffee lounges are proving an instant hit
with the general public.
St Pancras Chambers Hotel, London for Martek Contracts
We are proud to announce that we are currently undertaking the dry lining
contract at St Pancras Chambers Hotel, London. This grade 1 listed building
has been redundant since the 1960’s, but thankfully London &
Continental railways together with Manhattan Loft Corporation and Galliford
Try are currently transforming this great historic building into 68
luxury private apartments and penthouses. Our involvement includes:
Firewall compartmentation, interior wall layouts and plasterboard suspended
ceilings. This work will all be completed without disturbing the original
architectural design and character.
![]() |
![]() |


